Building Foundation Construction in Brazil – AT-65B Driving 6m × Ø300mm Steel Tube Piles
Aug.12.2025
In a building foundation project in Brazil, the AT-65B hydraulic pile hammer was used to drive Ø300mm, 6m long steel tube piles for building foundation support.
