Six Mounting and Carrier Configurations for Hydraulic Impact Hammers
A hydraulic impact hammer’s driving capability depends on carrier capacity, the guide system and the hydraulic power supply. Jiangsu Anteng Construction Machinery Co., Ltd. offers six configurations using excavators, cranes and crawler piling rigs. Select a setup based on pile length, pile weight, ground conditions and available site space.
1 Direct Excavator Mount. A mounting adapter connects the hammer to the excavator arm. The boom and stick position the hammer and make it easy to move between piles. Check lifting capacity at the actual working radius, lift height, hydraulic flow and pressure.
2 Excavator Leader Mount. The hammer travels along guide rails to help keep it aligned with the pile axis. Jiangsu Anteng’s reference setup uses a 3-tonne ram delivering 36 kJ of blow energy on an 18.5 m mast, with a maximum pile length of 12 m.
3 Crane Suspended. The crane lifts the hammer to the pile head, where site guides keep it aligned during driving. This configuration can position the hammer from shore or from a work platform within boom reach. Check crane capacity at the actual working radius.
4 Crane-Mounted Leader. The hammer moves vertically along guide rails fitted to the crane. The reference setup uses a 5-tonne ram delivering 60 kJ of blow energy on a 24 m mast, with a maximum pile length of 15 m. If reusing a leader, check that the rail profile matches the hammer’s guide shoes.
5 PM8-16 Piling Rig. This hydraulic pile driver setup uses a leader and winch to drive timber, steel and concrete piles. Ram weights range from 3 to 8 tonnes, with heavier options depending on the carrier’s capacity. The listed 8-tonne setup delivers 120 kJ of blow energy and handles piles up to 16 m long. Evaluate it against the project’s driving and repositioning requirements.
6 SM18 Pile Driver. The SM18 hydraulic crawler rig can carry a hydraulic impact hammer and can also be fitted with continuous flight auger drilling equipment or single- or multi-shaft mixing tools. For projects involving several foundation methods, consider how the rig will be used and verify mast and winch capacities and overall stability for the actual configuration.
The pile lengths and blow energies above apply to specific reference configurations. Confirm actual capacity against ground, pile and carrier conditions. When contacting Jiangsu Anteng Construction Machinery Co., Ltd., provide pile drawings, pile length and weight, target penetration depth, geotechnical information and existing equipment models so the hammer, pile cap, guides and power supply can be checked.
Jiangsu Anteng hydraulic impact hammer mounting and carrier configurations
|
1 Direct Excavator Mount 2 Excavator Leader Mount |
2 Excavator Leader Mount |
|
3 Crane Suspended 4 Crane-Mounted Leader |
4 Crane-Mounted Leader |
|
5 PM8-16 Piling Rig 6 SM18 Pile Driver |
6 SM18 Pile Driver |
6 SM18 Pile Driver